• <code id="ic04y"></code>
  • <nav id="ic04y"></nav>
  • <blockquote id="ic04y"><blockquote id="ic04y"></blockquote></blockquote><button id="ic04y"><blockquote id="ic04y"></blockquote></button>
  • <table id="ic04y"></table>
  • <blockquote id="ic04y"></blockquote>
  • <u id="ic04y"><legend id="ic04y"></legend></u>
  • <center id="ic04y"></center><noscript id="ic04y"><object id="ic04y"></object></noscript>
  • <legend id="ic04y"></legend>
    <table id="ic04y"><menu id="ic04y"></menu></table>
  • <menu id="ic04y"></menu><div id="ic04y"><kbd id="ic04y"></kbd></div>
    <small id="ic04y"><menu id="ic04y"></menu></small>
  • <td id="ic04y"><bdo id="ic04y"></bdo></td>
  • <s id="ic04y"><samp id="ic04y"></samp></s>
  • <menu id="ic04y"><small id="ic04y"></small></menu>
  • <table id="ic04y"></table>
  • <blockquote id="ic04y"><nav id="ic04y"></nav></blockquote>
    <menu id="ic04y"></menu>
  • <sup id="ic04y"></sup>
  • <sup id="ic04y"></sup>
  • <code id="ic04y"><object id="ic04y"></object></code>
    歡迎來到豫通工程管理有限公司咨詢電話:/ 400-831-9666

    精品工程

    臨高縣建制鎮污水處理EPC+O工程2021/05/14 09:02

             項目位于海南省臨高縣,本項目采用EPC+0模式,EPC+O模式即為工程建設期2年,加上運營期28年。在建設期,“EPC”合作范圍為新開工項目。在運營期,“O”范圍為所有新開工項目及改擴建項目的運營,同時負責涉及區域的面向用戶的污水服務,即解決污水收集和處理的問題。

             本工程子項目多,分布范圍廣,施工單體多,結構形式多樣;工期緊,任務重,協調配合工作量大;如何合理安排好工程各施工順序也是本工程的難點。

             受土質和地下水位影響,本工程基坑開挖和降水難度均較大,如何做好基坑開挖時的支護和降水是本工程的一大難點。

             本工程涉及土建、設備安裝、電氣安裝、室外配套、室外管網等,工程類別多,在施工中必須做好各專業的相互配合。

             部分場地地下水位較高,降水難度較大。因此在構(建)物施工時,應先施工深基礎構(建)筑物,后施工淺基礎構(建)筑物,以免較深基礎開挖時,危及相鄰基礎的安全。在水池施工過程中,應隨時注意基坑的水位變化,及時排除基坑積水或向水池內灌水,防止水池浮起或頂托破壞。

             根據所總結的工程特點和難點,我們對工程施工過程中將會遇到的施工技術難點、質量控制難點以及可能影響工程進度、安全和文明施工的不利因素進行了分析,并針對性的制定了預防措施和相應對策。